Home » Flitwick Town Centre Regeneration
| CLIENT | BEDFORD BOROUGH COUNCIL |
| LOCATION | FLITWICK, BEDFORDSHIRE |
| VALUE | £700,000.00 |
| DURATION | 4 MONTHS |
In December 2019, H&T began works on the rengeneration of Flitwick Town Centre, on behalf of Bedford Borough Council.
A new plaza was constructed in front of the Barclays bank, ready to host an outdoor market and/or entertainment for local residents. In addition, new paving was laid along the footways in the area, and the roads were resurfaced.
